Skip to content

Pull requests: red-hat-storage/ocs-ci

Author
Filter by author
Loading
Label
Filter by label
Loading
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Loading
Milestones
Filter by milestone
Loading
Reviews
Assignee
Filter by who’s assigned
Assigned to nobody Loading
Sort

Pull requests list

[release-4.16] fix packing logs in collect_pod_container_rpm_package cherry-pick This is cherry-pick (backport) lgtm size/XS team/ecosystem Ecosystem team related issues/PRs
#15150 opened May 14, 2026 by dahorak Contributor Loading…
Assuming ceph version is >= 19 if not determined for ODF 4.18 and above lgtm size/XS Verified Mark when PR was verified and log provided
#15149 opened May 14, 2026 by petr-balogh Member Loading…
Cherry pick 15115 lgtm size/L PR that changes 100-499 lines Verified Mark when PR was verified and log provided
#15148 opened May 14, 2026 by petr-balogh Member Loading…
Update finding radosnamespace and cephblockpoolradosnamespace DR Metro and Regional DR related PRs size/M PR that changes 30-99 lines Squad/Turquoise Verified Mark when PR was verified and log provided
#15145 opened May 13, 2026 by jilju Contributor Loading…
Add fixture to download virtctl before RDR tests DR Metro and Regional DR related PRs size/XS Squad/Turquoise Verified Mark when PR was verified and log provided
#15144 opened May 13, 2026 by jilju Contributor Loading…
Increase timeout for In-transit encryption size/S PR that changes 10-29 lines Squad/Brown
#15137 opened May 13, 2026 by prsurve Contributor Loading…
Centralize TLS configuration for NooBaa And RGW size/XXL
#15134 opened May 13, 2026 by paraggit Contributor Loading…
Adds test for RGW EC config verification High Priority High priority issues RGW Issues related to the Ceph Object Gateway size/L PR that changes 100-499 lines Squad/Red Verified Mark when PR was verified and log provided
#15133 opened May 13, 2026 by udaysk23 Contributor Loading…
Fix NFS mount failure on IBM Cloud by fixing retry logic and opening port 2049 (#15119) size/L PR that changes 100-499 lines
#15131 opened May 13, 2026 by amr1ta Contributor Loading…
Skip test_rgw_keda_ha in external mode RGW Issues related to the Ceph Object Gateway size/XS Squad/Red Verified Mark when PR was verified and log provided
#15129 opened May 13, 2026 by sagihirshfeld Contributor Loading…
[release-4.21] Fix NFS mount failure on IBM Cloud by fixing retry logic and opening port 2049 lgtm size/L PR that changes 100-499 lines Verified Mark when PR was verified and log provided
#15128 opened May 13, 2026 by openshift-cherrypick-robot Collaborator Loading…
RHSTOR-7964: Add consumer_name label validation for provider-mode metrics size/L PR that changes 100-499 lines Squad/Blue
#15127 opened May 13, 2026 by suchita-g Contributor Loading…
[release-4.18] Increase timeout for metallb deployment and storagecluster creation on provider mode cherry-pick This is cherry-pick (backport) lgtm size/S PR that changes 10-29 lines team/ecosystem Ecosystem team related issues/PRs
#15125 opened May 12, 2026 by dahorak Contributor Loading…
Use list copy to avoid updating original config value dr_cluster_relations DR Metro and Regional DR related PRs size/XS Squad/Turquoise Verified Mark when PR was verified and log provided
#15124 opened May 12, 2026 by jilju Contributor Loading…
Add tier1 post-upgrade test to verify the existence of noobaa prometheus ruels lgtm MCG Multi Cloud Gateway / NooBaa related issues size/S PR that changes 10-29 lines Squad/Blue Squad/Red Verified Mark when PR was verified and log provided
#15121 opened May 12, 2026 by sagihirshfeld Contributor Loading…
Update mirrors in hostedcluster during operator install and skip machineconfigpool check on hosted cluster DR Metro and Regional DR related PRs size/M PR that changes 30-99 lines Verified Mark when PR was verified and log provided
#15120 opened May 12, 2026 by jilju Contributor Loading…
2
3
Add live deployment param to deploy-fdf backport-required Mark for PRs that need to be backported to older release branches lgtm Needs Deployment Testing Needs Deployment and Some Tier1 Testing size/S PR that changes 10-29 lines team/ecosystem Ecosystem team related issues/PRs
#15118 opened May 11, 2026 by clacroix12 Contributor Loading…
Add happy-path test for NooBaaReplicationTargetUnreachable alert (RHSTOR-8110) lgtm MCG Multi Cloud Gateway / NooBaa related issues needs-rebase size/L PR that changes 100-499 lines Squad/Red Verified Mark when PR was verified and log provided
#15117 opened May 11, 2026 by sagihirshfeld Contributor Loading…
Add endpoint network disruption test for DFBUGS-5838 lgtm MCG Multi Cloud Gateway / NooBaa related issues needs-rebase size/L PR that changes 100-499 lines Squad/Red Verified Mark when PR was verified and log provided
#15116 opened May 11, 2026 by sagihirshfeld Contributor Loading…
[DNM]: Revert W/A for devicehealth module ceph health failure during ODF deployment (DFBUGS-6749) size/M PR that changes 30-99 lines
#15113 opened May 11, 2026 by vavuthu Contributor Loading…
ProTip! Add no:assignee to see everything that’s not assigned.