Skip to content

RELEASE: Releasing 13 package(s) (0.81-stable)#16222

Merged
vmoroz merged 1 commit into
0.81-stablefrom
prepare-release/0.81-stable
Jun 11, 2026
Merged

RELEASE: Releasing 13 package(s) (0.81-stable)#16222
vmoroz merged 1 commit into
0.81-stablefrom
prepare-release/0.81-stable

RELEASE: Releasing 13 package(s) (0.81-stable)

8a07192
Select commit
Loading
Failed to load commit list.
Azure Pipelines / PR succeeded Jun 11, 2026 in 32m 36s

Build #RNW_0.81.27.pr631222 succeeded with issues

Details

Tests

  • Failed: 0 (0.00%)
  • Passed: 15,918 (99.92%)
  • Other: 12 (0.08%)
  • Total: 15,930
Code coverage

  • 3382 of 4019 blocks covered (84.15%)
  • 3466 of 3945 lines covered (87.86%)
  • 3207 of 3783 blocks covered (84.77%)
  • 2932 of 3277 lines covered (89.47%)

Annotations

Check failure on line 22 in Build log

See this annotation in the file changed.

@azure-pipelines azure-pipelines / PR

Build log #L22

Cmd.exe exited with code '5'.