Skip to content

chore(deps): update aks/aks-gpu-grid docker tag to v570

47a2909
Select commit
Loading
Failed to load commit list.
Merged

chore(deps): update aks/aks-gpu-grid docker tag to v570 #8539

chore(deps): update aks/aks-gpu-grid docker tag to v570
47a2909
Select commit
Loading
Failed to load commit list.
Azure Pipelines / AKS Linux VHD Build - PR check-in gate (build build2404gen2containerd) succeeded May 23, 2026 in 42m 25s

build build2404gen2containerd succeeded with issues

Annotations

Check failure on line 1638 in Build log

See this annotation in the file changed.

@azure-pipelines azure-pipelines / AKS Linux VHD Build - PR check-in gate (build build2404gen2containerd)

Build log #L1638

CIS regressions detected (1). See cis-regressions.txt for details.