Skip to content

fix: close oracle round 14 gaps #142

fix: close oracle round 14 gaps

fix: close oracle round 14 gaps #142

Triggered via push April 14, 2026 05:22
Status Failure
Total duration 35s
Artifacts

ci.yml

on: push
packaging-smoke
22s
packaging-smoke
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

7 errors
test (3.11)
Process completed with exit code 2.
test (3.12)
The strategy configuration was canceled because "test._3_11" failed
test (3.12)
The operation was canceled.
test (3.13)
The strategy configuration was canceled because "test._3_11" failed
test (3.13)
The operation was canceled.
test (3.10)
The strategy configuration was canceled because "test._3_11" failed
test (3.10)
The operation was canceled.