Skip to content

fix: close oracle round 13 gaps #141

fix: close oracle round 13 gaps

fix: close oracle round 13 gaps #141

Triggered via push April 14, 2026 05:04
Status Failure
Total duration 33s
Artifacts

ci.yml

on: push
packaging-smoke
25s
packaging-smoke
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

7 errors
test (3.13)
Process completed with exit code 2.
test (3.12)
The strategy configuration was canceled because "test._3_13" failed
test (3.12)
Process completed with exit code 2.
test (3.11)
The strategy configuration was canceled because "test._3_13" failed
test (3.11)
Process completed with exit code 2.
test (3.10)
The strategy configuration was canceled because "test._3_13" failed
test (3.10)
Process completed with exit code 2.