Flexible Job Shop Scheduling Problem with Worker Flexibility (FJSSP-W)

Problem Description

The Flexible Job Shop Scheduling Problem with Worker Flexibility (FJSSP-W) extends the classical Flexible Job Shop Scheduling Problem (FJSSP) by incorporating workforce constraints.

In FJSSP-W:

  • A set of n jobs must be processed on m machines by w workers.
  • Each job consists of a sequence of operations that must be executed in order.
  • Each operation can be processed on one of several eligible machines.
  • Additionally, each operation requires a worker to be present during processing.
  • The processing time of an operation depends on both the assigned machine and the assigned worker.

Constraints

  1. Precedence: Operations within a job must be executed sequentially.
  2. Machine capacity: Each machine can process at most one operation at a time.
  3. Worker capacity: Each worker can work on at most one operation at a time.
  4. Assignment: Each operation must be assigned to exactly one (machine, worker) pair from the set of eligible combinations.

Objective

Minimize the makespan: the total time required for completing all jobs (i.e., the maximum completion time across all jobs).

Input Format

The input file format is as follows:

<nbJobs> <nbMachines> <nbWorkers> [(<avgMachinesPerOp>)]
<nbOperations for job 1>
  <nbMachineChoices for op 1> <machine1> <nbWorkerChoices> <worker1> <duration1> <worker2> <duration2> ... <machine2> <nbWorkerChoices> ...
  <nbMachineChoices for op 2> ...
<nbOperations for job 2>
  ...

Machines and workers are numbered starting from 1 in the input files.

Model Options

  • --flatAlternatives: Use a flat alternative constraint structure instead of the default hierarchical structure. By default, the model creates hierarchical alternatives: first selecting a machine, then selecting a worker for that machine. With this option, all (machine, worker) combinations are presented as a single flat alternative. This matches the CP formulation in the reference paper.

  • --redundantCumul: Add a redundant cumulative constraint limiting the number of operations that can be processed simultaneously to min(nbMachines, nbWorkers). This constraint is implied by the machine and worker no-overlap constraints but can help the solver prune the search space.

Note: The reference paper uses flat alternatives without redundant cumulative constraints. The default hierarchical structure in this implementation is an alternative formulation that may improve constraint propagation but creates more constraints.

Data files

The 402 instances in the data/ directory were downloaded from https://github.com/jrc-rodec/FJSSP-W-Benchmarking (directory instances/Example_Instances_FJSSP-WF).

The files were renamed from .fjs to .fjsw to distinguish them from standard FJSSP instances which use a different format.

Reference

Hutter, D. et al. "A Benchmarking Environment for Worker Flexibility in Flexible Job Shop Scheduling Problems", arXiv:2501.16159, 2025.