FINDINGS: 3
- PRD has no brief for slug
code-review: ./prd-code-review-2026-05-05.md — Do this: run/brief code-review execbefore Friday's launch-readiness gate. - Eval YAML run-summary is from a stale run vs. the in-flight prompt change: ./eval-code-review-2026-05-06.yaml → ./eval-runs/code-review-eval-2026-05-06/summary.md — Do this: re-run P0 subset (
tc-04,tc-08,tc-12) on 2026-05-09 morning per the run summary's re-run plan.
- Metrics counter-metric C1 ("PR cycle-time-to-merge") is not represented in the eval YAML. Files: ./metrics-code-review-2026-05-06.md, ./eval-code-review-2026-05-06.yaml — Do this: either add a post-merge cycle-time test case to the eval (probably a v0.2 of the suite, since cycle time needs production traffic) OR explicitly note in the eval YAML that C1 is measured in production telemetry, not in the eval suite. Confidence: high that this is a documentation gap, not a measurement gap.
- Nothing stale.